Search here for Tutorials

If the Data is different in your question, please send your questions to homeworksolutionsnow@gmail.com. The questions will be answered at the same price.

Major Instrument, Inc. manufactures two products: missile range instruments and space pressure gauges.

E4-11 Major Instrument, Inc. manufactures two products: missile range instruments and space pressure gauges. During April, 50 range instruments and 300 pressure gauges were produced, and overhead costs of $89,500 were estimated. An analysis of estimated overhead costs reveals the following activities.
Activity
Cost Driver
Total Cost
1
Material handling
Number of requisitions
$40,000
2
Machine setups
Number of setups
$27,500
3
Quality inspections
Number of inspections
$27,000
$94,500
 
The cost driver volume for each product was as follows.
Cost Driver
Instruments
Gauges
Total
Number of requisitions
400
600
1,000
Number of setups
200
300
500
Number of inspections
200
400
600
 
Instructions
(a) Determine the overhead rate for each activity.
(b) Assign the manufacturing overhead costs for April to the two products using activity-based costing.
(c) Write a memorandum to the president of Major Instrument explaining the benefits of activity-based costing. (Enter your answer in the block below.)
 
TUTORIAL PREVIEW
(a) Determine the overhead rate for each activity.
Activity Cost Pools
Estimated
Overhead
÷
Expected Use of Cost Drivers per Activity
=
Activity-based
Overhead Rates
Materials handling
$40,000
÷
1,000
=
$40
Machine setups
$27,500
÷
500
=
$55
 
File name: E4-11 Major Instrument.xls  File type: xls  PRICE: $6

Altex Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead to assign to each product line, the controller


E4-4 Altex Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead to assign to each product line, the controller, Robert Hermann, has developed the following information.

Car
Truck
Estimated wheels produced
40,000
10,000
Direct labor hours per wheel
1
3
Total estimated overhead costs for the two product lines are
$770,000

 
Instructions
a. Compute the overhead cost assigned to the car and truck wheels, assuming that direct labor hours is used to allocate overhead costs.
b Hermann is not satisfied with the traditional method of allocating overhead because he believes that most of the overhead costs relate to the truck wheel product line because of its complexity. He therefore develops the following three activity cost pools and related cost drivers to better understand these costs.
(c) Compute the cost that is assigned to the car wheels and truck product lines using an activity-based costing system, given the following information.
d What do you believe Hermann should do? (Enter your text answer in the block below.)

 
TUTORIAL PREVIEW
a. Compute the overhead cost assigned to the car and truck wheels, assuming that direct labor hours is used to allocate overhead costs.
Direct labor hours for car wheels (40,000 x 1)
40,000
Direct labor hours for truck wheels (10,000 x 3)
30,000
Total direct labor hours
70,000


File name: E4-4 Altex Inc.xls  File type: xls  PRICE: $6

Wilkins Inc. has two types of handbags- standard and custom. The controller has decided to use a plant wide overhead rate based on direct labor costs.


E4-1Wilkins Inc. has two types of handbags: standard and custom. The controller has decided to use a plant wide overhead rate based on direct labor costs. The president has heard of activity-based costing and wants to see how the results would differ if this system were used. Two activity cost pools were developed: machining and machine setup. Presented below is information related to the company’s operations.

Standard
Custom
Direct labor costs
$50,000
$100,000
Machine hours
1,000
1,000
Setup hours
100
400

Total estimated overhead costs are $270,000 Overhead cost allocated to the machining activity cost pool is $170,000 and $100,000 is allocated to the machine setup activity cost pool.

 
Instructions:
a. Compute the overhead rate using the traditional (plantwide) approach.
b. Compute the overhead rates using the activity-based costing approach.
c. Determine the difference in allocation between the two approaches.


TUTORIAL PREVIEW
a. Compute the overhead rate using the traditional (plantwide) approach
Estimeted overhead
Predetermined overhead rate
Direct labor costs

 
$270,000
180% of direct labor
($50,000 + $100,000)

 
File name: E4-1Wilkins Inc.xls  File type: xls  PRICE: $5

The Polishing Department of Harbin Company has the following production and manufacturing cost data for September. Materials are entered at the beginning of the process.

E3-11 The Polishing Department of Harbin Company has the following production and manufacturing cost data for September. Materials are entered at the beginning of the process.
 
Production: Beginning inventory 1,600 units that are 100% complete as to materials and 30% complete as to conversion costs; units started during the period are 38,400 ending inventory of 5,000 units 10% complete as to conversion costs. Manufacturing costs: Beginning inventory costs, comprised of $20,000 of materials and $43,180 of conversion costs; materials costs added in Polishing during the month, $177,200 labor and overhead applied in Polishing during the month, $125,680 and $257,140 respectively.
 
 
Instructions
a. Compute the equivalent units of production for materials and conversion costs for the month of September.
b. Compute the units costs for materials and conversion costs for the month.
c. Determine the costs to be assigned to the units transferred out and in process.
 
TUTORIAL PREVIEW
a. Compute the equivalent units of production for materials and conversion costs for the month of September.
Physical Units
Work in process, September 1
1,600
Units started into production
38,400
40,000
 
File name: E3-11 The Polishing.xls  File type: xls  PRICE: $5

The Sanding Department of Richards Furniture Company has the following production and manufacturing cost data for March 2014, the first month of operations.

E3-7 The Sanding Department of Richards Furniture Company has the following production and manufacturing cost data for March 2014, the first month of operations.
 
Production: 9,000 units finished and transferred out; 3,000 units started that are100% complete as to materials and 20% complete as to conversion costs.

Manufacturing costs:
Materials
$33,000
Labor
$24,000
Overhead
$36,000
 
Instructions
Prepare a production cost report.
 
 
TUTORIAL PREVIEW
Prepare a production cost report.
 
RICHARDS FURNITURE COMPANY
Sanding Department
Production Cost Report
For the Month Ended March 31, 2014
Equivalent Units
Physical
Units
Materials
Conversion
Costs
Quantities
Units to be accounted for
   work in process, March 1
0
 
 
   Started into production
12,000
 
 
 
 
File name: E3-7 The Sanding.xls File type: xls-template PRICE: $5