Cash flows are forecasted on a project. It uses internal rate of return rule to accept or reject projects. Should this project be accepted if the required rate of return is 12%. 
Co = -10,000; C1=0, C2 = +7,500; C3= +8,500.
In addition to the answer can you provide the formula? 
  
 
SOLUTION PREVIEW
Year     CF                    PV factor @12%         Present
Value   PV factor @22% Present value
0- 10,000 1 -10000 1 -10000
0- 10,000 1 -10000 1 -10000
1          0                      0.893                           0                      0.82                             0
2          7,500               0.797                           5977.5             0.672                           5040